Board of Zoning
Appeals
General Information
|
Are
LANDSCAPING PLANS required?
- If landscaping and screening
is required by Section 295-75 of the Milwaukee Code of Ordinances,
then a landscape plan must be submitted to the Board office as
part of the application.
Is a SURVEY required?
- If a dimensional variance from
the required setbacks is requested, then a survey must be submitted
as part of the application. - OR -
- If any new construction is proposed,
then a survey must be submitted as part of the application.
Are BUILDING ELEVATIONS required?
- If a new building or structure
of any type is proposed, plans showing each elevation of each
new structure must be submitted as part of the application.
- If any addition or alteration
of the exterior of any building or structure is proposed, plans
showing each elevation of each structure to be modified must
be submitted.
Are FLOOR PLANS required?
- If a special use or variance
applicaiton involves the physical occupancy of a structure, a
floor plan of each floor that is to be used must be submitted
as part of the application.
Are SIGN PLANS required?
- If a special use or variance
application involves the use of any type of signage, sign plans
must be submitted that show the details of all signs that are
existing or proposed.
Is a PLAN OF OPERATIONS required?
- A plan of operations is required
for all use variance applications and all special use applications.
A plan of operations is not required for a dimensional variance.